News Details
Development of the Quality Infrastructure (QI) Roadmap for the Egyptian PV Market
التاريخ : 22 / 1 / 2023
the Egyptian-German Joint Committee on Renewable Energy, Energy Efficiency and Environmental Protection (JCEE) and in collaboration with NREA , a QI Roadmap for Egyptian Market was developed after the identification of existing gaps in the market


As the Egyptian PV market is growing exponentially, it was required to develop a Quality Infrastructure roadmap to provide awareness, trust, safety & quality assurance to support this growth. Within the framework of cooperation between the Ministry of Electricity and Renewable Energy (MOERE), the New and Renewable Energy Authority (NREA), the Electricity Utility and Consumer Protection Regulatory Agency (EgyptERA), Electricity Distribution Companies, as well as the private sector, the Egyptian-German Joint Committee on Renewable Energy, Energy Efficiency and Environmental Protection (JCEE) and in collaboration with NREA , a QI Roadmap for Egyptian Market was developed after  the identification of  existing gaps in the market. The assignments focused on four key areas: on-grid & off-grid regulations, local manufacturing and capacity building.  The framework was based on the deployment of: Standards, Certification, Testing Processes, Accreditation, Inspection Bodies, Metrology & Market Surveillance.

The methodology of the assignment was based on:

1-      Identifying involved stakeholders

2-      Extracting identified gaps from the points of views of the stakeholders

3-      Generating & prioritizing suitable solutions to achieve market maturity

4-      Developing the QI Roadmap for the Egyptian PV market.

Upon the completion of the assignment, an awareness session was conducted for the involved stakeholders on the 21st of November 2022 to present the outcomes of the developed roadmap as well as the action plan

Back to News