Wind Farms
  • The total installed capacities in Zafarana wind farm is 745 MW in 2015/2016.
  • The wind farms includes 700 turbines from different models (600 kw, 660 kw, 850 kw).
  • This wind farms were implemented on several stages since 2001, through Governmental cooperation protocols with Germany, Denmark, Spain and Japan.

  • The station was implemented in cooperation with the German Construction Bank (KfW), the European Investment Bank (EIB) and the European Commission (EU).
  • Type of turbine G80 .
  • The number of turbines is 120 turbines and the capacity of each turbine is 2 MW (240 MW).
  • Executing companies:(GAMESA-ENERGYA-CAIRO CONTRACTING COMPANY).

Main technical indicators for existing wind stations from 2010 to 2017/2016


Evolution of composite power
(MW)
Evolution of energy produced
(Million kWh)


Fuel savings
(Thousand BP)
Reduction in emissions
(Thousand tons of Creole dioxide)
  • The station was implemented in cooperation with the Japanese Agency for International Cooperation (JICA).
  • Type of turbine G80 .
  • The number of turbines is 110 turbines and the capacity of each turbo is 2 m (220 m).
  • Executing companies: (GAMESA).
  • The project was completed and run on 24/7/2018.