Photovoltaic cell systems on roof bulidings
-
The completion of the implementation of (4) stations with a total capacity of 82 kW. Above the roofs of some buildings in the General Authority hall and have been connected to the network as follows :-
-
Power plant (42) kW above the engineering building
-
Power plant (30) kW above the engineering building
-
Power plant (5) kW above the administrative building
-
Power plant (5) KW above the surface of the main water tank